Have any Questions? +01 123 444 555

Building for the future - a bird's eye view - MHKW and KVA Stapelfeld

Replacement construction of the waste-to-energy plant (MHKW) and the new construction of the sewage sludge mono-incineration plant (KVA).

The 220 million Euro project of EEW in Stapelfeld ensures that in the future 64,000 households in the region will be supplied with sustainably generated electricity from waste. This means that more than twice as much electricity will be generated from up to 350,000 tons of waste while the district heating supply will remain unchanged.

Heitkamp Industrial Solutions contributes its experience in the construction of industrial buildings which are being equipped for the energy turnaround.

Go back

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 -199

Socials

© 2024 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
You are using an outdated browser. The website may not be displayed correctly. Close