Have any Questions? +01 123 444 555

CCPP / Gas & Steam Turbine Plant Herne

Construction of a reinforced concrete structure of a gas and steam turbine plant on the factory premises of STEAG Herne.

The demanding performance includes large concrete structures with up to 2,200 m³ as well as numerous built-in parts for steel and plant engineering that have to be installed. Construction site equipment, excavation between 777 ramming piles, special civil engineering, reinforced concrete work for the foundations of the plant construction, outbuildings and switch houses, stair tower in sliding construction, locksmith and expansion work.

The total earth excavation is 23,000 m³ and 18,000 m³ of construction concrete will be installed.

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 -199

Socials

© 2024 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
You are using an outdated browser. The website may not be displayed correctly. Close