Gas & Steam Turbine Plant Bonn
Presently, the CCGT plant consists of a gas turbine (GT) with a downstream waste heat boiler and a steam turbine. Within the scope of the modernisation, a number of conversion and modernisation measures will be carried out zo increase the efficiency of the CCGT plant. The structural building projects include:
- Construction of a turbine building incl. switchgear rooms, transformer installation room and gas turbine foundation
- Construction of a workshop and office building incl. TGA
- Construction of a foundation for the installation ofa waste heat boiler
- Construction/adaptation of the outdoor facilities/traffic routes