Have any Questions? +01 123 444 555

Gas & Steam Turbine Plant Bonn

Presently, the CCGT plant consists of a gas turbine (GT) with a downstream waste heat boiler and a steam turbine. Within the scope of the modernisation, a number of conversion and modernisation measures will be carried out zo increase the efficiency of the CCGT plant. The structural building projects include:

  • Construction of a turbine building incl. switchgear rooms, transformer installation room and gas turbine foundation
  • Construction of a workshop and office building incl. TGA
  • Construction of a foundation for the installation of a waste heat boiler
  • Construction/adaptation of the outdoor facilities/traffic routes

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 -199

Socials

© 2024 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
You are using an outdated browser. The website may not be displayed correctly. Close